i.e. cross check with other luminaire; functional test performed in laboratory
i.e. compatibility between LED Driver and LED Module or ballast and flourescent lamp, etc.
Is there a proper earth connection in case it is required by the device?
If applicable
(Costs for the return are bared by the receiver)
Fields marked with * are mandatory. In the case of missing information WLK may reject the RMA